sale

Dog Tracking Leash Long Leads Non-Slip Nylon Training Walking 3m 5m 10m 15m For Medium Large Dogs Soft Padded Handle

Rating
$13.99 $11.19





SHOCK-ABSORBENT lightweight premium rope will never hurt your arm from your canine buddy pulling too hard. Our padded handle DOESN\'T RUG BURN YOUR HANDS while still helping you maintain a tight hold on your furry companion. LONG TERM INVESTMENT - Use it as training puppy leash. Then, as he grows, you can keep using this glow in the dark strap to SAFELY walk him or her in the park Heavy duty, SUPER STRONG CLIP HOOK that ensures your best friend will never run away while jogging. The excellent fabrics make it harder for your puppy to chew and destroy this tether.

  • Brand Name: Beirui
  • Season: All Seasons
  • Material: Nylon
  • Type: Dogs
  • Size: 3m, 5m, 10m, 15m
  • Feature: Padded
  • Pattern: Braided
  • Applicable Dog Breed: Large Medium-sized Dog
  • Model Number: BJL03
  • Dog Leash Type: Basic Leashes
  • Remaining Shelf Life: >6 months

  • Package Weight: 0.2kg (0.44lb.)
  • Package Size: 10cm x 9cm x 8cm (3.94in x 3.54in x 3.15in)
  • Unit Type: piece

  • Author: Gazmendbytyqi
  • Date: 2017-12-05
  • good leash, comfortable handle holding. прослужит long. recommend) delivery fast, two weeks.
  • 5/5

  • Author: Liuwei Hu
  • Date: 2017-11-13
  • leash super. durable, is very sturdy. also looks dignified. lining have soft handle hand not have cuts. the only thing 5 meters, after all is too long.
  • 5/5

  • Author: Recepsari 007
  • Date: 2017-10-17
  • excellent quality, soft handle, large durable carabiner, 2 дошло, thank you! recommend!
  • 5/5

  • Author: Doughd54
  • Date: 2018-03-13
  • delivery before the moscow smoothly month. packed well. like leash. hand hinge soft. заявленному size: length 3 m, 17mm width. looks dignified operation but show.
  • 5/5

  • Author: Medzhidova 1990
  • Date: 2017-10-22
  • really super leash. non-slip rubber because in hand! high quality!!! i'm very satisfied purchase. delivery before the moscow 12 track trackable. seller recommend!!
  • 5/5